Skip to content
+45 31 70 08 89info@climbpartner.dk
Facebook
CLIMB Partner
Your rope access partner
CLIMB Partner
  • Home
  • About
  • Project execution
  • QHSE
  • References
  • Contact
  • Home
  • About
  • Project execution
  • QHSE
  • References
  • Contact

Author Archives: Jan Ruzicka

bactoforce
ZoomDetails

BACTOFORCE – NDT inspections inside towers

BACTOFORCE, NDT (certified)By Jan Ruzicka23. January 2018

CLIMB Partner is working with BACTOFORCE performing NDT inspections inside towers and siloes within the dairy and pharmaceutical industry. CLIMB Partner is supplying the rope access knowhow, techniques and procedures (RAMS) for the task, Bactoforce is supplying the NDT inspectors and equipment for NDT task. This working relationship is expanding and is now international.

a2sea_logo
ZoomDetails

A2SEA – Sea Challenger

A2SEA, Mechanics (certified), Painting (Spray and brush) with Epoxy certificate, Rigging via rope accessBy Jan Ruzicka23. January 2018

CLIMB Partner was contracted through SubC Partner to perform various painting, rigging and installation jobs during the stay in Esbjerg. CLIMB Partner supplied a 6-man team to get the tasks done in a safe and efficient manner. Yet another happy client on the list.

a2sea_logo
ZoomDetails

A2SEA Sea Installer

A2SEA, Mechanics (certified)By Jan Ruzicka23. January 2018

CLIMB Partner and SubC Partner worked together to upgrade and retrofit piping under deck, rig and install new pipes/spools under deck and inspect the X section to strengthen the jack up legs, some of the X sections had to be re tightened and shims installed. Task went according to schedule and completed in a safe…

1 remove grating and mark-drill the installation holes for the brachet
3 use zink spray for rust protection before instalation2 drilling the installation holes for the 2nd bracket1 remove grating and mark-drill the installation holes for the brachet

Sandbank windfarm – OSS – installation of Amplemenn landing bracket

CLIMB Partner assisted Sub C Partner in the installation of brackets to the AMPLEMANN boat landing at 2 locations on the Vattenfall SANDBANK offshore wind farm. The old boat landing spot proved to be insufficient and Sub C Partner designed and fabricated the new and upgraded landing brackets, CLIMB Partner supplied to 2 trusted rope…

Sandbank windfarm, VattenfallBy Jan Ruzicka23. January 2018
2 - dry run, settingup the platform frame in the OSS workshop
DanTysk 12 technicians installing 2 x work platforms in the HV roomsDanTysk 12 technicians installing 2 x work platforms in the HV rooms2 - dry run, settingup the platform frame in the OSS workshop

Vattenfall DanTysk windfarm – installation of work platform

CLIMB Partner was contracted through ALLNRG to assist Vattenfall at DANTYSK offshore wind farm during shutdown in 2016 to install 2 x work platforms is the OSS´s High voltage rooms, CLIMB Partner´s 12 rope access technicians worked with great precision during the shutdown and manages to satisfy the client and keep the tight deadline set…

installation of work platform, VattenfallBy Jan Ruzicka23. January 2018
1 - internal blade inspections
3 - external inspection of some leaks under the nacell2 - external blade inspections performed by rope access1 - internal blade inspections

Siemens – Blade inspection @ Baltic 2 wind farm

Climb Partner was contracted to assist in the internal/external blade inspection of 25 Siemens 3,6mw units located in the Baltic sea, windfarm Baltic 2. All 25 units were inspected both internal and externally as pr. The clients request, a blade inspection report was created for each turbine detailing all the minor and larger imperfections/damages and…

Siemens, Siemens - Blade inspectionBy Jan Ruzicka23. January 2018
hub anchor point inspection

Siemens hub anchor point inspection

Climb Partner was contracted to assist 3sun Group in the inspection of anchor points in the hubs of Siemens 6mw WTG, the inspection task was performed on the key side/harbour in Esbjerg, a total of 14 hubs were inspected and re-certified by means of rope access.

Siemens, Siemens hub anchor point inspectionBy Jan Ruzicka23. January 2018
1 - power curve upgrade siemens 3,6 MW

Siemens 3,6 leading power curve upgrade Anholt

Siemens offshore windfarm: Anholt Climb Partner assisted ALLNRG in delivering 1 x IRATA L3 Supervisor to assist with basic blade Work, PCU – power curve upgrade to the Siemens 3,6mw WTG.

Anholt, SiemensBy Jan Ruzicka23. January 2018
1 checking all cable ties and brackets connecting the cale tray bracket to the WTG tower
3 replace missing bolts2 tighten all brackets1 checking all cable ties and brackets connecting the cale tray bracket to the WTG tower

Nysted offshore wind farm – cable letters in towers

Climb Partner assisted ALLNRG on Nysted offshore Wind farms 72 Siemens 2,3 mw units. The task was to inspect the cable letters inside the WTG towers, all findings such as: Loose bolts to be tightened Missing nuts/bolts to be replaced Missing cable ties to be re-fitted The task was estimated to take 12 weeks, we…

Nysted offshore wind farm - cable letters in towers, SiemensBy Jan Ruzicka23. January 2018
NDT Tyra East

NDT @ TYRA EAST

Climb Partner was contracted to assist FORCE Technology during a NDT inspection job, the task was to inspect and measure the internal walls of a caisson.  

Maersk, NDT @ TYRA EASTBy Jan Ruzicka23. January 2018
1234
Climbpartner ApS 2018

Climbpartner ApS, Sønderbyvej 28, 6950 Ringkøbing - Phone: +45 31 70 08 89 - Email: info@climbpartner.dk - CVR: 36901020 | Code & Design: BlueCoffeeCup.com

Go to Top

Ved at bruge hjemmesiden accepterer du brugen af cookies mere information

Cookie indstillingerne på denne hjemmeside er aktiveret for at give dig den bedste oplevelse. Hvis du fortsætter med at bruge hjemmesiden uden at ændre dine cookie indstillinger eller du klikker Accepter herunder, betragtes dette som din accept

Luk