Skip to content
+45 31 70 08 89info@climbpartner.dk
Facebook
CLIMB Partner
Your rope access partner
CLIMB Partner
  • Home
  • About
  • Project execution
  • QHSE
  • References
  • Contact
  • Home
  • About
  • Project execution
  • QHSE
  • References
  • Contact

Albums Archives: Siemens

1 - internal blade inspections
3 - external inspection of some leaks under the nacell2 - external blade inspections performed by rope access1 - internal blade inspections

Siemens – Blade inspection @ Baltic 2 wind farm

Climb Partner was contracted to assist in the internal/external blade inspection of 25 Siemens 3,6mw units located in the Baltic sea, windfarm Baltic 2. All 25 units were inspected both internal and externally as pr. The clients request, a blade inspection report was created for each turbine detailing all the minor and larger imperfections/damages and…

Siemens, Siemens - Blade inspectionBy Jan Ruzicka23. January 2018
hub anchor point inspection

Siemens hub anchor point inspection

Climb Partner was contracted to assist 3sun Group in the inspection of anchor points in the hubs of Siemens 6mw WTG, the inspection task was performed on the key side/harbour in Esbjerg, a total of 14 hubs were inspected and re-certified by means of rope access.

Siemens, Siemens hub anchor point inspectionBy Jan Ruzicka23. January 2018
1 - power curve upgrade siemens 3,6 MW

Siemens 3,6 leading power curve upgrade Anholt

Siemens offshore windfarm: Anholt Climb Partner assisted ALLNRG in delivering 1 x IRATA L3 Supervisor to assist with basic blade Work, PCU – power curve upgrade to the Siemens 3,6mw WTG.

Anholt, SiemensBy Jan Ruzicka23. January 2018
1 checking all cable ties and brackets connecting the cale tray bracket to the WTG tower
3 replace missing bolts2 tighten all brackets1 checking all cable ties and brackets connecting the cale tray bracket to the WTG tower

Nysted offshore wind farm – cable letters in towers

Climb Partner assisted ALLNRG on Nysted offshore Wind farms 72 Siemens 2,3 mw units. The task was to inspect the cable letters inside the WTG towers, all findings such as: Loose bolts to be tightened Missing nuts/bolts to be replaced Missing cable ties to be re-fitted The task was estimated to take 12 weeks, we…

Nysted offshore wind farm - cable letters in towers, SiemensBy Jan Ruzicka23. January 2018
Climbpartner ApS 2018

Climbpartner ApS, Sønderbyvej 28, 6950 Ringkøbing - Phone: +45 31 70 08 89 - Email: info@climbpartner.dk - CVR: 36901020 | Code & Design: BlueCoffeeCup.com

Go to Top

Ved at bruge hjemmesiden accepterer du brugen af cookies mere information

Cookie indstillingerne på denne hjemmeside er aktiveret for at give dig den bedste oplevelse. Hvis du fortsætter med at bruge hjemmesiden uden at ændre dine cookie indstillinger eller du klikker Accepter herunder, betragtes dette som din accept

Luk