Dong Energy

CLIMB Partner were contracted to assist Sub C Partner/DONG Energy at the HEJRE installation, the main job for CLIMB Partner was installation of rings to be installed on the platform legs near the splash zone designed to fight marine growth on the platform legs following the tide up/down the leg automatically.

Furthermore the CLIMB Partner team assisted in installation of life rafts and general safety equipment on the platform, the team is always happy to assist outside the original scope of work is for some reason rope access tasks are not possible, flexibility is key!

CLIMB Partner delivered a professional team of 6 trusted and highly professional rope access techs.