CLIMB Partner was asked to brainstorm on a solution to realign the mail tubes on the tension wires supporting the structural integrity of the SIRI platform on the Danish North sea sector.

The working area was considered hard to reach as we had to get access under the hull of the platform and close to the splash zone. Tension lines were rigged for easy/safe access to the work site. This system would also be used for a rescue scenario with the use of an ACT-SAFE winch.

The project was executed within the planned time frame of the task.