Vattenfall Kriegers Flak replacement of the firefighting clamp system

vattenfall logo

CLIMB Partner was contracted to assist with the replacement of the firefighting clamp system under the heli deck @ KRIEGERS FLAK wind farm on the substation. Safe access under the heli deck was done by aid-climbing by our professional rope access team. The task was completed/delivered on time to yet another satisfied client.

Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system
Vattenfall Kriegers Flak replacement of the firefighting clamp system

Related projects

a2sea_logo
Zoom

A2SEA – Sea Challenger

A2SEA, Mechanics (certified), Painting (Spray and brush) with Epoxy certificate, Rigging via rope access
a2sea_logo
Zoom

A2SEA Sea Installer

A2SEA, Mechanics (certified)
vattenfall logo
Zoom

DanTysk windfarm – installation of work platform

Confined Space trained technicians, Electricians (EX certified), Mechanics (certified), Vattenfall, Welders (certified)
vattenfall logo
Zoom

Sandbank windfarm – OSS – installation of Amplemann landing bracket

Mechanics (certified), Painting (Spray and brush) with Epoxy certificate, Rigging via rope access, Vattenfall
Siemens logo
Zoom

3,6 leading power curve upgrade Anholt

Mechanics (certified), Siemens
Dong Energy
Zoom

Hejre – installation of marine growth rings

Dong Energy, Mechanics (certified), Rigging via rope access
Dong Energy
Zoom

SIRI/Maersk Giant Rigging/Installation of gangway between SIRI-GIANT

Dong Energy, Mechanics (certified)
maersk logo
Zoom

Maersk Tyra West rigging/caisson reinforcement

Maersk Oil, Mechanics (certified)
Dong Energy
Zoom

Siri-Maersk Giant gangway removal

Dong Energy, Maersk Oil, Mechanics (certified)
Climbpartner.dk
Contact us
jesper

Jesper Lauridsen
Managing Director

  • Phone: +45 31 70 08 89
  • Email: info@climbpartner.dk

Find us on:

FacebookLinkedin
Climbpartner ApS 2018

Climbpartner ApS, Sønderbyvej 28, 6950 Ringkøbing - Phone: +45 31 70 08 89 - Email: info@climbpartner.dk - CVR: 36901020 | Code & Design: BlueCoffeeCup.com

Go to Top

Ved at bruge hjemmesiden accepterer du brugen af cookies mere information

Cookie indstillingerne på denne hjemmeside er aktiveret for at give dig den bedste oplevelse. Hvis du fortsætter med at bruge hjemmesiden uden at ændre dine cookie indstillinger eller du klikker Accepter herunder, betragtes dette som din accept

Luk